Made in NZ

Call Us: 0800 433 623 Call Us: 0800 433 623

TE ARA TAHUNA ESTUARY CYCLEWAY & WALKWAY


The 7.5km Orewa Estuary cycle and wallkway crosses 5 bridges and was a Rodney District Council
legacy project which was completed by the Auckland SuperCity Council.


Te Ara Tahuna opened in December 2011 and connects some of Orewa's newest areas with the
Hibiscus Coast beaches, community facilities and the expanding residential areas. FGS Metalwork
was approached to manufacture balustrades for the Orewa Cycleway Bridge which was being
constructed by the Warehine Group.

FGS Metalwork worked closely with engineers from Hutchinson Consultants to produce the required
balustrade and fabricated it all in our Silverdale workshop.

The 7.5km pathway winds its way around the beautiful Orewa Estuary and is a great place for the whole
family to get out and enjoy the area together.  Distance markers are placed at 1km intervals from the
Western Reserve. It's a great place to walk, run, cycle and push a pram.


Hot dipped galvanised steel was used for the fabrication to ensure longevity in
the harsh coastal environment.


The blue line indicates the walkway around the estuary.

Call us to discuss your bridge or any steelwork needs on 0800 433 623.

© 2021 FGS Group Ltd | All rights reserved | Website design Auckland by fuel.